Boat Ramp Upgrade with Articulated Block Mats- Kirk Wilson Point VIC – 1230

PROJECT:

Articulated concrete Block matting to the sides and toe of the new boat ramp and under the new jetty. Installation by Bridgewater Marine for Vic Parks.

LOCATION:

KIRK POINT WILSON POINT VIC 3212

PROJECT STATS:

Mat: Articulated Concrete Cable Block Mats
Interconnecting Cable : Stainless Steel Cable
Anchoring: Cable Clamps and Ubar Anchors

OUR REF: ACM 1230

INSTALLATION & CLIENT:

Installation works by
Bridgewater Marine

Read more about the project on VIC PARKS WEBSITE: